200 BARIBEAU
Waitlist
The Baribeau row at dusk: brick, charcoal, wood doors glowing
VANIER2028

282 rental townhomes in Vanier, for the life that usually waits for a mortgage. Drink your coffee on the steps. Take them two at a time. Learn the neighbours' names. First doors open 2027.

Join the waitlist
L'idée · the idea

Hintonburg happened. Wellington West happened. Vanier is next. Ten minutes from Parliament, still priced for ordinary money. 282 front doors, before everybody says they knew.

An oak front door, number 9, a bike by the stoop
La porte, un matin d'automne · the door, one fall morning

Settle in properly. Hang the shelves. Get the dog.

Most of what rents around here is somebody's tired walk-up, or a condo the owner might sell next spring. Baribeau is neither: purpose-built rental, new from the studs out, owned and managed by the people who built it. Nobody is selling this home out from under you. Paint the wall. Stay ten years.

282 front doors

The lit ones, Building 9's thirty-six, open first.
The row on a golden Saturday, kids chalk-drawing, neighbours on stoops
Un samedi, 16h · a Saturday, 4pm
Chalk on the sidewalk. A baguette in a basket. Nobody in a hurry.
The park on a frost morning, a runner on the path
Le parc, premier gel · the park, first frost

1,270 m² of public park, in every season this city actually has.

Not a courtyard behind a gate: parkland conveyed to the City in the approved plan, extending St. Ambroise Park along the homes' southern edge. Frost mornings, chalk summers, maple falls: Saturday soccer, first-snow photos, the long way home the dog insists on. Grass at the end of your street, for everyone, forever.

Un Samedi, 16H
UN SAMEDI, 16H
Chalk on the sidewalk. A baguette in a basket. Nobody in a hurry.
Le Voisinage
LE VOISINAGE
The mews is the room all 282 homes share.
Premier Gel
PREMIER GEL
First frost on the park. The runner has it to herself.
Un Soir De Janvier
UN SOIR DE JANVIER
Snow up the window. Warm on your side of it.
Le Plan, Complet
LE PLAN, COMPLET
Nine buildings, a mews, a park. Added to Vanier, not landed on it.
200baribeau· Vanier, Ottawa
Dinner in the mews
♥ 214   💬 18
200baribeau Premier souper dans le mews. First dinner in the mews. 🍞
marie.vnr enfin quelque chose de beau à Vanier 🙌
chiens.dottawa the dog approves. la mews >>>
j_beauchamp613 waitlist done ✅ c'est quand le move-in?
specimen · imagined post, real plan
Dinner at a small table outside a front door in the green mews
Le voisinage · the neighbours
The mews is the room all 282 homes share.
String lights go up without a committee, and the people two doors down stop being strangers by August.
Le plan du site · the site

Nine buildings, a mews, a park. The whole block

BARIBEAU STREET CARILLON STREET LANDRY STREET B136 homes B324 homes B536 homes B836 homes courtyard +common room B236 homes B636 homes B936 homes · first to open B424 homes B718 homes the mews parking · 71 stallsoptional, surface only St. Ambroise Park, extended 1,270 m², public forever

Stylized from the approved plan (Hobin A1.01, stamped Aug 2026), not to scale.

The mewscar-free spineevery door reaches the park without crossing a road
Courtyard & common roomcentre of the planthe multi-purpose building, for birthdays and rainy Saturdays
Bike podsat each clustercovered, at your door. This is a cycling neighbourhood
Parking, if you want it71 surface stallsoptional and separate, never baked into your rent
The park1,270 m²conveyed to the City in the plan. Public, permanent
Les maisons · the homes

Studios to two-bedrooms

Three sizes of the same idea: a home that is yours from the sidewalk in.

Studio~40 m² from $1,5XXyour first place with your name at the door. No roommates, no hallway
One bedroom~50 m² from $1,8XXroom for the dog, the bike, and someone staying for breakfast
Two bedroom~75 m² from $2,2XXbedtime upstairs, your evening downstairs. Two floors of yours
Les plans · the floor plans

Choose your door.

Every home is one 4.5-metre bay deep: the window wall at the quiet end, your door at the other, nothing wasted between. Reconstructed from the approved drawings; final plans reach the waitlist first.

200 BARIBEAUVANIER · OTTAWAST.9LE STUDIOcarte du logement · the studio≈40 m² · 430 sq ftfrom $1,5XX / month, set at releaseSURFACES · APPROX.Entrée + rangement3.9 m²Cuisine4.6 m²Vivre + dormir26.4 m²Bain5.1 m²TOTAL40.0 m²BÂTIMENT 9 · VOTRE TRAVÉE200baribeau.ca · location@parkriver.ca · Baribeau & Carillon, Vanierillustrative reconstruction from the approved massing · final plans at release · specimen by Post MundaneBAINbathtubwcENTRÉEentryWDCUISINEkitchenfrVIVRE + DORMIRlive + sleepbed 137×1918.9 m4.5 m
Le quartier qui monte · a neighbourhood rising

You are not the only one betting on Vanier.

The proof is not our word. The City of Ottawa's own register shows 26 development applications within a 20-minute walk of this block: the Beechwood cluster, Montreal Road, a fresh 2026 filing on Selkirk, a thirteen-storey permission on Bradley. Money this patient does not gather around a place that is staying the same.

St. Patrick StreetMcArthur AvenueBeechwood Avenue500 m1 km1.5 kmBradley · 13-st permissionBeechwood clusterSt-DenisSelkirk · 2026Montreal Rd200 BARIBEAURideau River ↘application active or pendingapproved or closed

Real geography: streets, river and parks © OpenStreetMap contributors; every dot a real application on the City of Ottawa register, plotted at its filed address. North is up.

26applications within 1.6 kmCity of Ottawa register, fall 2026
Beechwood2 active sitesthe errands street, getting better
10 minto downtownby bike or bus, over the river
Inside the studio: oak, plants, the door
Le studio · your first place
The green and oak kitchen with a bistro table
La cuisine · the park green comes inside
The bright living room, golden light
Vivre · golden hour, every day it earns it
Les chiffres · plainly

The numbers, with the mood lighting off.

That was the life. This is the math, stated as directly as we can, and where a number is not final, it says so instead of pretending.

HomeSizeRentFirst availability
Studio~40 m² · ≈430 sq ftfrom $1,5XX, set at releaseBuilding 9 · target 2027
One bedroom~50 m² · ≈540 sq ftfrom $1,8XX, set at releaseBuilding 9 · target 2027
Two bedroom~75 m² · ≈810 sq ftfrom $2,2XX, set at releaselater phases · 2028
282homes · nine 3-storey buildings
36homes in Building 9, first to open
Aug 2026site plan approved, City of Ottawa
71surface stalls; parking optional, never bundled
1,270 m²parkland conveyed, public forever
2027–28*move-ins by phase

*What the dates mean: the site plan is approved and Building 9's permit is filed; construction timelines shift, and we will not promise a month until we can keep it. Rents marked "set at release" are placeholders from today's Vanier market; final pricing comes with the first release, waitlist first. Parking is a separate monthly line; homes are priced as homes. No key deposits; nothing beyond Ontario's standard rules.

La liste · the waitlist

36 doors open first.
Be behind one.

Thirty-six households get to be first. Floor plans, final pricing and move-in dates reach the waitlist before anything is public: one email at release, nothing else. In five years everyone will say they saw Vanier coming. You actually will have.

One email when homes release. Unsubscribe anytime.
The nine buildings at night, lit windows across the block
Le plan · complete
Nine buildings, a mews, a park.
Added to Vanier, not landed on it.